Skip to content
Multi-tenant office corridor with a seating nook and suite doors, the spaces to compare in commercial cleaning bids

Resources

Janitorial bid comparison checklist for Tracy property and office managers

Janitorial proposals rarely share a format. This printable sheet asks every bid about the work, the hours, supplies, oversight, coverage papers and how service begins, so a Tracy decision rests on answers.

Request a quoteCall (209) 299-7715

Printable checklist

Download the PDF

A sheet that makes proposals comparable

Collect three janitorial proposals and you will likely get three shapes. One opens with a monthly figure, one with pages of tasks, one with photos of equipment. Read back to back, the most polished one tends to stick in memory, suited to your building or not. This checklist asks each proposal identical questions and leaves room for the replies.

Print a fresh copy for each bid and fill it in as you read. Use one copy per bid, staple it to that proposal’s cover page, and keep going until every bid has its own sheet. When the stack is done, lay the sheets out together. An empty line means that proposal never answered the question, which makes it the first thing to raise on a follow-up call.

The sheet has no line for price; the dollar side lives in our 2026 Tracy cleaning prices guide, which explains what moves the number. This page covers everything the number should be buying, so you know what you are comparing before the figures come out.

Scope and frequencies

Begin with the work. A bid that leaves out rooms or visits less often will come in lower, and the sheet makes that visible instead of letting it hide in a total.

  • Every area from your room list named in the bid
  • A frequency beside each area: nightly, several times a week, weekly or monthly
  • Restroom and kitchen tasks written out, not just named
  • Periodic floor and carpet work listed with its own interval
  • Extras such as porter hours or pressure washing on separate lines
  • Any task you did not request flagged for a question

If you have not written your room list yet, our guide to building a cleaning scope walks through it area by area.

Some sites put several uses under one roof: offices beside a warehouse floor, a showroom with a service bay, a clinic inside a retail center. When yours does, add a line under scope for each part of the building, and check that every bid treats those parts the same way.

Shift restrooms and break rooms in a distribution building, for example, may need a different cleaning window from the front offices. A proposal that prices the whole site on one schedule is answering a different question from one that splits it, so note which approach each bid takes before you compare anything else.

Hours, access and supplies

The second block covers how the work fits into your building’s day. These answers decide whether the crew spends its time cleaning or waiting at a locked door.

  • Cleaning window inside the hours your building sits empty
  • Service days spelled out, holidays included
  • How the crew enters: keys, cards, alarm codes
  • Paper, soap and liners: who purchases them and who loads the dispensers
  • Where stock and equipment will be stored on site
  • Plan for locked rooms and areas the crew skips

Write the answers in the proposal’s own words where you can. A phrase like “evenings as needed” reads very differently on paper next to “Monday to Friday after 6 p.m.”, and that difference often explains more than any line item does.

Supervision and inspections

Written tasks are worth what the follow-up makes of them. Note how each proposal describes its own follow-through, and how the results come back to you.

  • How often the work is inspected, and by whom
  • How inspection findings are shared with you
  • Who your day-to-day contact is
  • Steps for flagging a miss and getting it redone

On our side, quality inspections by supervisors measure each visit against your task list, and that is the kind of answer worth writing down for every bid.

Insurance and proof of coverage

Request a certificate of insurance from every bidder and note on its sheet the date the document lands. Record whether the proposal states insurance, a bond, workers’ compensation coverage and background-checked crews. Keeping the same four lines on every sheet means no bid gets a pass on them.

Every Tracy Janitorial client receives a certificate of insurance. The company is bonded, carries workers’ compensation and sends background-checked cleaners into each building.

How the first weeks are planned

The way a company plans its first weeks says a lot about the months that follow. Look for a proposal that describes the start, not only the steady state.

  • A walkthrough of the building before the quote
  • Proposed start date and what the first night covers
  • How keys and alarm instructions are handed over
  • How you send requests, and the reply time the bid states
  • Date set for looking back over the plan together

Tracy Janitorial walks every building before quoting. Leaving another provider to make the change? Our guide to changing cleaning providers covers the handover itself.

Hold each proposed start date up against your own calendar as well. A quiet week makes a better first night than the week of an audit, a big delivery or a visit from head office.

Reading the finished sheets

Start with the blanks. A proposal with several empty lines either needs a follow-up or tells you how carefully it was prepared. Next, compare the scope blocks: same rooms, same frequencies, same periodic work on separate lines. Then hours and supplies, since a bid that assumes you buy the paper is not pricing the same job as one that supplies it.

Only after those blocks line up should the prices come in. At that point, a difference in the monthly figure points to something real, and the sheets show you what it is. From there, our guide to picking a janitorial company covers the final choice.

A few useful answers

Common questions

How many copies of the sheet do I print?

One for each bid you receive. Each proposal gets its own sheet, which keeps notes about different companies from blending together.

Why is there no line for price?

A monthly figure tells you little until you know the work behind it. Fill in scope, hours, supplies and inspections first, then read the figures with those answers in front of you.

A bid skipped one of the questions. Now what?

Ask that company to answer the question, then write its reply and the date on the sheet. A blank that stays blank after a follow-up is an answer in itself.

Does Tracy Janitorial see the building before quoting?

Yes. Every building gets a walkthrough before we price it, and most lines on this sheet are settled during that visit.